Datacentre Power Testing (Təyin edildi)
  • Üstünlük - Alçaq
  • Təsiredici Başqa - Data Centre
  • Upcoming scheduled maintenance notice

    During this period we will be performing a load transition onto the generators.

    This forms part of our maintenance schedule to ensure that our backup systems will cope with the load.

    Power will be transitioned onto the generators for a period of time before being transitioned back to mains again.

    All UPS protected equipment should not experience any power loss, however this should be considered an at-risk period.

    Start time
    Jun 18, 07:00 BST

    Estimated duration
    4 hours

    Components affected
    Data Center Power Status

  • Tarix - 18/06/2019 07:00 - 18/06/2019 11:00
  • Son yenilənmə - 10/06/2019 12:32
MariaDB upgrade (Davam edir)
  • Üstünlük - Alçaq
  • Təsiredici Server - Titanium
  • We are upgrading MariaDB (MySQL), this will not cause any server outages, but very brief (seconds) interruptions to the SQL Server will occur as it is stopped and started a small number of times.

  • Tarix - 29/04/2019 11:52 - 29/04/2019 14:00
  • Son yenilənmə - 29/04/2019 12:30

Server statusu

Serverin vəziyyətini burdan görə bilərsiniz.

Server HTTP FTP POP3 PHP məlumatı Server yüklənir İşlək vaxt
Iridium PHP məlumatı
Osmium PHP məlumatı
Platinum PHP məlumatı
Titanium PHP məlumatı