Datacentre Power Testing (Programado)
  • Prioridade - Baixo
  • Afetando Outros - Data Centre
  • Upcoming scheduled maintenance notice

    During this period we will be performing a load transition onto the generators.

    This forms part of our maintenance schedule to ensure that our backup systems will cope with the load.

    Power will be transitioned onto the generators for a period of time before being transitioned back to mains again.

    All UPS protected equipment should not experience any power loss, however this should be considered an at-risk period.

    Start time
    Jun 18, 07:00 BST

    Estimated duration
    4 hours

    Components affected
    Data Center Power Status

  • Data - 18/06/2019 07:00 - 18/06/2019 11:00
  • Última Atualização - 10/06/2019 12:32
MariaDB upgrade (Em Andamento)
  • Prioridade - Baixo
  • Afetando Servidor - Titanium
  • We are upgrading MariaDB (MySQL), this will not cause any server outages, but very brief (seconds) interruptions to the SQL Server will occur as it is stopped and started a small number of times.

  • Data - 29/04/2019 11:52 - 29/04/2019 14:00
  • Última Atualização - 29/04/2019 12:30

Status do Servidor

Abaixo está uma lista em tempo real do status de nossos servidores, onde você pode verificar se há algum problema.