Datacentre Power Testing (Planerad)
  • Prioritet - Låg
  • Gällande Övrigt - Data Centre
  • Upcoming scheduled maintenance notice

    During this period we will be performing a load transition onto the generators.

    This forms part of our maintenance schedule to ensure that our backup systems will cope with the load.

    Power will be transitioned onto the generators for a period of time before being transitioned back to mains again.

    All UPS protected equipment should not experience any power loss, however this should be considered an at-risk period.

    Start time
    Jun 18, 07:00 BST

    Estimated duration
    4 hours

    Components affected
    Data Center Power Status

  • Datum - 18/06/2019 07:00 - 18/06/2019 11:00
  • Senast Uppdaterad - 10/06/2019 12:32
MariaDB upgrade (Pågående)
  • Prioritet - Låg
  • Gällande Server - Titanium
  • We are upgrading MariaDB (MySQL), this will not cause any server outages, but very brief (seconds) interruptions to the SQL Server will occur as it is stopped and started a small number of times.

  • Datum - 29/04/2019 11:52 - 29/04/2019 14:00
  • Senast Uppdaterad - 29/04/2019 12:30

Serverstatus

Tabellen under visar status på våra servrar. Du kan på denna sida se om de olika funktionerna fungerar eller är tillgängliga.

Server HTTP FTP POP3 PHP Info Serverbelastning Upptid
Iridium PHP Info
Osmium PHP Info
Platinum PHP Info
Titanium PHP Info