Datacentre Power Testing (Запланований)
  • Пріоритет - Низький
  • Дія Інший - Data Centre
  • Upcoming scheduled maintenance notice

    During this period we will be performing a load transition onto the generators.

    This forms part of our maintenance schedule to ensure that our backup systems will cope with the load.

    Power will be transitioned onto the generators for a period of time before being transitioned back to mains again.

    All UPS protected equipment should not experience any power loss, however this should be considered an at-risk period.

    Start time
    Jun 18, 07:00 BST

    Estimated duration
    4 hours

    Components affected
    Data Center Power Status

  • Дата - 18/06/2019 07:00 - 18/06/2019 11:00
  • Останнє оновлення - 10/06/2019 12:32
MariaDB upgrade (В процесі)
  • Пріоритет - Низький
  • Дія Сервер - Titanium
  • We are upgrading MariaDB (MySQL), this will not cause any server outages, but very brief (seconds) interruptions to the SQL Server will occur as it is stopped and started a small number of times.

  • Дата - 29/04/2019 11:52 - 29/04/2019 14:00
  • Останнє оновлення - 29/04/2019 12:30

Статус серверу

Нижче показаний статус наших серверів (і проблеми, якщо такі є).

Сервер HTTP FTP POP3 Інформація про PHP Завантаження серверу Тривалість роботи
Iridium Інформація про PHP
Osmium Інформація про PHP
Platinum Інформація про PHP
Titanium Інформація про PHP