Datacentre Power Testing (Scheduled)
  • Priority - Low
  • Affecting Other - Data Centre
  • Upcoming scheduled maintenance notice

    During this period we will be performing a load transition onto the generators.

    This forms part of our maintenance schedule to ensure that our backup systems will cope with the load.

    Power will be transitioned onto the generators for a period of time before being transitioned back to mains again.

    All UPS protected equipment should not experience any power loss, however this should be considered an at-risk period.

    Start time
    Jun 18, 07:00 BST

    Estimated duration
    4 hours

    Components affected
    Data Center Power Status

  • Date - 18/06/2019 07:00 - 18/06/2019 11:00
  • Last Updated - 10/06/2019 12:32